We have been pulling off vinyl on the exterior part of the front porch
this week. The clapboards look pretty good underneath. A few boards need
replacing, and a new drip edge and trim installed. Before photos posted
- stay tuned for the rest of the story.
7.20.2012
6.04.2012
My Crummy Old House Looks Better than Yours ...
In a previous post, in March (so long ago), I detailed the rebuild of the back door and all the other crap that had to be redone, as more and more wet-rot was discovered on the west wall (the back) of the house. One part of that rebuild that was attempted, but not satisfactorily completed, was the south-west corner of the house.
Sadly, this corner has seen the absolute worst weather of any part of the house. The rain hits it full-force, the sun bakes it all day long, and it's where the most pedestrian traffic passes.
The last "contractor (charlatan?)" to work on the house was STEVE MARCH who left me with this insane, "I-can't-even-figure-out-what-process-went-on-in-his-damaged-brain-to-put-together-this-haphazard-contraption" thing below.
Wishing on a rainbow
So, rather than accommodate this hideous mess, I went out on a limb ... I wished upon a rainbow and received from a friend, gotta love her, the following glitter-bedecked unicorn image. She sent it after she read the "crummy house" post (thanks Jill, you're a doll.)
Less than 2 weeks after receiving this "glittering prize," I scheduled to meet with a builder that we have used many times in the past (still not sure why he didn't do the backdoor ...). He came over and we discussed the mess, talked about the simple, clean solution that I wanted, and in a few days, he had the whole thing rebuilt.
The original design of this corner of the house was as such:
See photo below, it will hopefully make some sense.
Since creepy Steve went crazy with his saw-zaw, several clapboard ends were not salvageable. Some clapboards also exhibited wet rot on their ends (near the corner) that would have proved awkward to patch effectively.
The best option was to patch in a new vertical corner board on the bottom part of the wall that was wider than the original 3 inch wide corner board. That way the bad ends of the clapboards could be trimmed back a few inches to clean, sound wood. The new corner board would match the width of the original porch post immediately above, thereby visually extending a single "post" from the top of the porch to the foundation.
In reality, patching a new wide corner board onto the existing original old porch post would have created another area for potential water leak—fewer joints means fewer potential leaks. I opted to remove the old porch post board, and use a single 12-foot long piece of lumber to fill in the removed porch post and missing corner board—one single board that extends top to bottom.
Removing some additional wood gave me a chance to clean out the structural parts of the corner, add some insulation and shore-up the existing structure—some areas were a little "soft."
A few days later, when the weather permitted, I primed and painted the area ... finally.
I also put down a new floor in the sun room and have been painting it - I plan to stencil it to look like encaustic tiles. Have been working a lot in the Japanese garden and have plans to scrape and paint the front porch floor, soon. Look for more, here, soon.
Sadly, this corner has seen the absolute worst weather of any part of the house. The rain hits it full-force, the sun bakes it all day long, and it's where the most pedestrian traffic passes.
The last "contractor (charlatan?)" to work on the house was STEVE MARCH who left me with this insane, "I-can't-even-figure-out-what-process-went-on-in-his-damaged-brain-to-put-together-this-haphazard-contraption" thing below.
| Steve March, a terrible contractor i would never hire or recommend, made an absolute mess out of this corner of my house. His remedy was awful and he destroyed many original details in the process. |
![]() |
| A different angle so you can better see the contraption that wraps around the old porch post (sheathed in aluminum - the aluminum went away) |
Wishing on a rainbow
So, rather than accommodate this hideous mess, I went out on a limb ... I wished upon a rainbow and received from a friend, gotta love her, the following glitter-bedecked unicorn image. She sent it after she read the "crummy house" post (thanks Jill, you're a doll.)
I think it worked.
Less than 2 weeks after receiving this "glittering prize," I scheduled to meet with a builder that we have used many times in the past (still not sure why he didn't do the backdoor ...). He came over and we discussed the mess, talked about the simple, clean solution that I wanted, and in a few days, he had the whole thing rebuilt.
A few accommodations along the way
The original design of this corner of the house was as such:
the outside wall of the house was built of horizontal clapboards that met in the corner at a 3 inch wide vertical corner board. Above that was a ledge for the porch opening. On the ledge sat a "post," built-up of 4 wide-boards on the corner of the porch to support the porch roof.
See photo below, it will hopefully make some sense.
Since creepy Steve went crazy with his saw-zaw, several clapboard ends were not salvageable. Some clapboards also exhibited wet rot on their ends (near the corner) that would have proved awkward to patch effectively.
The best option was to patch in a new vertical corner board on the bottom part of the wall that was wider than the original 3 inch wide corner board. That way the bad ends of the clapboards could be trimmed back a few inches to clean, sound wood. The new corner board would match the width of the original porch post immediately above, thereby visually extending a single "post" from the top of the porch to the foundation.
In reality, patching a new wide corner board onto the existing original old porch post would have created another area for potential water leak—fewer joints means fewer potential leaks. I opted to remove the old porch post board, and use a single 12-foot long piece of lumber to fill in the removed porch post and missing corner board—one single board that extends top to bottom.
Removing some additional wood gave me a chance to clean out the structural parts of the corner, add some insulation and shore-up the existing structure—some areas were a little "soft."
A few days later, when the weather permitted, I primed and painted the area ... finally.
I also put down a new floor in the sun room and have been painting it - I plan to stencil it to look like encaustic tiles. Have been working a lot in the Japanese garden and have plans to scrape and paint the front porch floor, soon. Look for more, here, soon.
3.17.2012
One-Sided Arch Wrap-up.
Last time I had a chance to discuss this arch was a couple of months ago, in January. It's one of seven in the house that I want to square-up and re-frame as they originally were. This one is in the stairway to the third floor. See the previous post for more info about it.
Part-way through I had to stop and do some work on the outside of the house. Got most of the outside buttoned-up a few weeks ago which gave me time to get back to the third floor and finish this arch and re-paint the hallway.
Here's pretty much where I left off at the end of January:
Since then I added the header and jamb to the top part of the door frame - the original bottom / sides of the jamb were still there. Then fitted in some trim on the "up-side" of the arch-way. the trim matched "new trim" that is already in the third floor, rather than what's in the rest of the house. Threw in some drywall patches and a bit of spackle, too. The down side of the arch will be done another time (the trim on that side of the archway matches the main part of the house). The rest of this section of the stairs and hall were re-painted, too. .
Here are some photos of the next few stages to finish up. Threw in a few images of the rest of the hall, too. It's strikingly different with color on it - white sure makes things blah ....
Part-way through I had to stop and do some work on the outside of the house. Got most of the outside buttoned-up a few weeks ago which gave me time to get back to the third floor and finish this arch and re-paint the hallway.
Here's pretty much where I left off at the end of January:
| looking up the stairs, this is what it looked like before adding the header - check out the post called "Archie by Jughead" for details about what happened before this stage. |
Since then I added the header and jamb to the top part of the door frame - the original bottom / sides of the jamb were still there. Then fitted in some trim on the "up-side" of the arch-way. the trim matched "new trim" that is already in the third floor, rather than what's in the rest of the house. Threw in some drywall patches and a bit of spackle, too. The down side of the arch will be done another time (the trim on that side of the archway matches the main part of the house). The rest of this section of the stairs and hall were re-painted, too. .
Here are some photos of the next few stages to finish up. Threw in a few images of the rest of the hall, too. It's strikingly different with color on it - white sure makes things blah ....
| Color is better here, and ... |
| focus is better here ... |
| close up, compare with the "before" photo, below. |
| What a mess - of course I negledted to take a pure before shot of this arch, but you can see the curved shape above the new 2x4 header. |
3.15.2012
Giving You the Best That I Got
A follow-up the my post last week about the back door re-do.
I found a before photo - its a weird angle taken before we bought the house, but It gives a look at the washed out blinding white blur that was ...
I found a before photo - its a weird angle taken before we bought the house, but It gives a look at the washed out blinding white blur that was ...
3.11.2012
"... you know it's your crummy old houses fault ... "
Mid-winter is not regarded as a good time to change out a door jamb, let alone yank out an 8 foot by 12 foot wall leaving a major hole in the house for weeks. But, we had been band-aiding the water leak around the door, under the threshold and into the basement wall, below, for about 2 years, and the weather wasn't that bad for February.
note: upon proofing this entry it appears that I complain a lot. My intent is not to complain, but to shine a light on the shoddiness of the work that a paid professional did for us. Please use this entry as a lesson when you hire someone to work on your house.
The old back porch was enclosed soon after the house was built. We have a photo from about 1921 that shows it enclosed by then, but it was not built as an enclosed porch. Look at that amazing black and white photo at the top of this page, if you look carefully you can see a small drain pipe coming out of the middle of the long wall under the porch windows, 5 clapboards down. That's the same kind of drain that is on the open front porch. No one would drain an enclosed room.
The back door sits in what was the 6-foot-wide opening onto the porch that is bounded on the right by an original square porch post and on the left by the exterior wall of the house. Originally, there were side lights that filled the space on either side of the door in this wide opening, but in 2005, all of the original windows, the 85-year-old door and sidelights were removed from the house and the old porch and filled in with vinyl windows*, a steel door and corrugated aluminum panels where the glass side lights were. All of them have been leaking ever since.
* Sales reps for white vinyl windows claim that their 35-year warranty is the best offered, anywhere. They claim that the windows will pay back your "investment" in energy savings within 2 years. In our previous house, built in 1895, the original wood windows were, with just a little care, in perfect working condition since the house was built. If your sales rep from World-of-Vinyl-Windows can offer you a 115-year warranty like that, then you should absolutely, no questions asked, make that purchase. Current studies show that the real payback time on new vinyl windows is 45-70 years, meaning, you will recoup your "investment" 10-35 years after the windows fall apart. Carefully consider all options before purchasing vinyl replacement windows.
| Visible problem: right side - dark spots at threshold are wet porch floor boards. Not as bad on this side ... or so it appeared. Just remember what mom said: "appearances can be deceiving." |
| Close up showing the PO's one-and-only repair tool: Spray foam. |
So, we hired Steve March, who had been working on a neighbors house for about a year, to repair the water infiltration issues around the back door.
He sold himself to us as an "old-fashioned" carpenter.
We fired him as an incompetent liar (recently, a friend, upon learning of this tale of woe, referred to Steve, more appropriately, as a charlatan.)
The one-day plan was to remove the door and the two small infill walls on either side, fit a new jamb and threshold, frame up and clad the new infill walls, and rehang the door. No big whoop, right?
When Steve arrived, 3 hours later than scheduled, we, together, began stripping off the aluminum coverings around the door. With some of the vinyl and aluminum removed the path of water infiltration became clear. It was coming in below the corrugated aluminum panels on each side of the door where the installers, who are still in business, left three-quarter inch gaps between the corrugated aluminum cover panels and the outside flooring and squeezed in a "bit" of caulk to seal that massive gap. The water then traveled below the threshold and into the wall below the door.
We had the rep from the company that installed this door and infill walls come over in early January to give us a price to replace the whole thing. He talked on-and-on about what a great job they did with the installation and that the reason our door threshold leaked was because of sagging due to the poor way in which the whole house was constructed 110 years ago. That's not the first time we were blamed for a construction workers stupidity ... read on.
| That soft fuzzy looking stuff is wet wood. The leak on the side of the door traveled under the threshold and soaked through the floorboards and into the basement. |
| Another view of the water-rotted original floorboards. It still makes me sad to see the neglect purposefully done to this lovely old house. |
| Floorboards gone. Yes, it's sad, but also necessary to rebuild the door surround. At least only a small section was removed. The most damaged area. |
I Should Have Been More Insistent to use High Quality Materials
During the first day I discovered that part of the old porch floor was too rotted to lay in a new threshold, let alone re-frame the infill walls. After lengthy discussion, ok, mostly arguement, I agreed to the removal of about 9 inches of rotted flooring so that a new plywood "subfloor" could be fitted into the gap. I should have insisted on at least similar strip flooring, like the old porch floor, but I was not thinking clearly. Steve is a "fast mumbler" (he never talked, just mumbled), and looking back I cannot believe I settled, but, the floor will be covered with some kind of yet undecided flooring, so maybe it's not as bad as I think.
When the floor was removed the worst of the damage became visible. The whole wall below the door, the wooden upper-half of the basement wall, was water rotted through the clapboard and sheathing.
(note: I had no idea how thick old sheathing was. I thought it was about 1/8 inch thick material hung on a diagonal, but in this house its 1.5 inch thick planks of wood hung on the diagonal. DANG).It also became clear that additional water was being funneled into the wall because of how the deck was added (in about 1970.) The main deck attachment board was nailed, not bolted, on top of the clapboards, cinching the old, original stair flashing against the house and diverting water into the wall.
Hey Everyone - This is Important Stuff
When you attach something to your clapboard house, like a deck or a new porch roof, you must remove the clapboards in that area, first, to get a proper, secure attachment of the board to the framing of the house. Also, flashing must be carefully fitted up into/behind the extant clapboards above the attachment board or you'll have a wet water-logged mess on your hands.
Down came the clapboard and sheathing on the basement wall. The job just got big.
Day one ended with some plywood screwed to the exterior of the house to close up the massive hole that was created. We were expecting snow that night for the first time this winter.
The basement wall immediately below the back door was rebuilt over the next few days. New studs were added onto the new sill plate we installed, ourselves, a while back, and new beams to span the damaged ones were installed. A "jack" was permanently added to improve support for this damaged area (these are metal pole systems that can be used as temporary or permanent support for weakened areas.) The sheathing is no longer beautiful 1.5 inch thick diagonally laid poplar, instead its that creepy "weather-proof" chip board so popular on new construction. A new door jamb was installed along with new framing around the door to fill the opening. It too was sheathed in chip board. I am kicking myself for not just doing this myself from the beginning. I would have used thick, quality materials. I spend my nights awake, listening for the new stuff to shrivel-up.
Over the next few days Steve and I fought regularly, and repeatedly, about how things should be done. We disagreed on flashing (I use it, he doesn't), we disagreed on style (It's my house, he wanted to tear off all the original clapboards and add plastic, Colonial Revival features from Home Depot to the exterior doorway, like eagles and flags) and we couldn;t find a similarity if life depended on it. He told me he never lies (I have a theory on people who say this, ask me sometime.) He repeated, over and over, that flashing is not needed in exterior home building but caulk can fix anything from a slipped disc to the national debt crisis. He repeated that he never builds things out of square (see stairs, below, for one example of 12 documented, out-of-square measurements.)
There were a number of days when he worked on the house while I was at the office. I'd come home and glance at his shoddy workmanship, have a talk with him the next morning and arrive back home that evening to see that he not only didn't fix the problem, but screwed it up more than it already was, and created a new problem. This became the exasperating pattern for about 4 days.
After that, Matthew, who, unlike me, is the opposite of OCD, began to see the issues more clearly. We had a "come to Jesus" meeting with Steve. He was given 2 more days to complete things the way we needed them to be done. We weren't asking for impossible feats, just fundamental skills. We wanted wood joints re-cut and re-fitted so they actually touched (in many cases, his joints were fitted with more than 3/4 inch gaps between parts); we wanted him to never use caulk on anything (he was a "flaccid-caulker"—people who hold the caulk gun, squeeze the trigger, and just flip it about - if they hit the hole where you need caulk, great, if not, great ... a lot like a 2-year-old using the toilet); we wanted the trash-strewn yard cleaned up.
Do I Have to do Everything Myself? or Does Anyone Know a Good Lawyer?
The day before he was told to never, again, set foot on our property, I had "a little free time" (oh, come on, you read this blog, you know that's a little bit of my humor, I haven't had "free time" since 1974.) Since he could not even complete the simplest tasks we gave him, see above, and since I was fuming mad and couldn't stand it any longer, I tore (almost) all of his work off of the house and began from (almost) scratch.
Since the new framing and studs he did were actually, sort-of, OK, I did not redo that. After tearing off all the clapboards, I lined the new exterior walls with tar paper from one of the rolls he bought with our cash (he stole the second while claiming that you only use paper under brick ... I want that roll of paper back ...) and added flashing before laying up the clapboard. This time, rather than lay the 7 inch tall clapboard with a 6.5 inch reveal, as he did (the reveal is the amount of clapboard you can see - in this case it means that the boards only overlapped by 1/2 inch, not only wrong, but irresponsible), I laid them with a 4.25 inch reveal to match the original clapboards, overlapping them by a more sensible 2.75 inch. I rebuilt the window ledge where he left a 1-inch gap between the sill and the wall. I rebuilt the door surround so it replicates the original exterior door surrounds, including coping ends to fit around the new crummy threshold.
| Tar paper up, butyl flashing secured around door framing, clapboards begin their ascent to the top of the door. Yes, it was drizzling this day so I worked under the blue tarp. |
| New door frame moldings coped to fit around the aluminum threshold. All hand cut with coping saw and chisels—it's easier by hand, really. |
| Original back door to the house, now inside the sun room. Molding and surround replicated on new back door surround, below. |
| New door surround. Using stock lumber I replicated the proportions of the original, albeit just a little beefier than the original. Painted, it's hard to tell its not old. |
| The rebuilt "outhouse". |
The worst of all the rebuilding was taking off the deck stairs. The stairs should pitch away from the house a little to drain water, and they need to sit at least 4 inches away from the house. The old clapboards on the house were in need of scraping, repair and painting, and the space between the stairs and the house was for me to get in there and accomplish that work (scraping & painting were not part of his contract.) On the day we did the final inspection, and the stairs were already in the wrong place, i brought up the agreed upon distance. He claimed that caulk would fix it all. I then asked if the stairs would drain away from the house. His reply was that he builds everything square and level. When I laid my 4-foot level on the stairs, not only did they not pitch away from the house, they weren't level, either, but they did pitched into the house. more water funneled into the wall.
His level said they were square, mine must be broken.
On this day he didn't have his special magical level in his truck to provide the "correct" answer (yes, I'm still bitter ...).
Next, he not only built the stairs right against the house, he nailed them into the house. Almost like he was saying "ha, ha, I screwed you ..." (...still bitter...)
| Stairs before rebuilding—slammed smash-tight against the house, just like I said not to do. |
It took Matthew and I nearly 4 hours to un-build those stairs one Saturday morning, carefully prying them from the house without damaging the old clapboards. It took me, alone, only about 1 hour to correctly build them 6 inches from the house, pitched properly, too. Having that space improves ventilation under the deck, too.
While work moved forward on the house exterior I learned that the clapboards, which I thought were cedar, are indeed redwood. That better explains the brilliant orange color of the wood in the color photo, above. I also researched to learn that in about 1880 redwood became more readily available since the lumber barons in California stripped the old growth trees out-of-existence, milled them into weatherproof timber, and shipped eastward for home building. Also, check out the colonial shape of the clapboard, with that severe bevel cut into the upper, overlapping, edge. Redwood clapboard is the "Cadillac" of siding and is available today for premium pricing.
| Back-side view of the original redwood clapboard siding on the house. The upper edge bevel is visible on the lower right part of this profile. |
Painting Peace
Nearly 2 months after starting the work, loosing sleep from emotional exhaustion, I was finally able to put on some paint this past week.
Painting is very zen for me—I find it calming to concentrate on small details and get carried away from the overall dread of the work and carried into seeing only the color and shapes being created at the tip of my brush. Strangely, I feel the same about applying caulk, and now, I learned, laying up clapboard. These tasks are rhythmic and soothing.
| Dark Olive Green body color with Fawn trim, both Sherwin Williams colors. Yes, the white will go " by- by". Sadly, and in classic form, there is no before photo of this area of the house ... |
| Here you can see the rebuilt window sill, some new clapboards under the sill, and the whole new door area. the upper deck is new as is the wall below the door (unseen, blocked by the deck). |
Overall, the back of the house does look a bit wonkey and patchwork since there is still work to be done on the "old" house before painting the entire area the same color - but getting this much done in between bouts of rain, sleet and 2 days worth of some very severe tornadoes (you've all seen that on the news), is a huge step forward. At least the wall is put together more correctly, now, and the wood is protected with 4 layers of new paint over 2 layers of primer.
*Overkill on the paint ? maybe—maybe not. This wall faces west and gets the worst of the rain thrown against it. I'd rather have the extra layers of paint than not enough.
Till the weather warms, I think I am finished with this part of the house. It's stable, now, and that big hole on the front porch that Matthew's foot made when he fell thru the floor is a bigger issue.
1.28.2012
Archie by Jughead(s)
Down and Dirty ... Another arch needed to be removed (there were 7 in the house when we bought it) and this one, on the stairs to the third floor, is really wearing out my patience.
Arches here at the JS house were put in to replace the wood framed doorways that were original to the house. This one is no exception. Most of the arches were installed using a purchased metal framing kit, made up of three pieces of metal that, when fit together into the doorway, transformed beautiful wood framed openings, into "seductive, curvaceous, sirens, leaving all who look upon them wide-eyed and frightened that anything so horrific could be done to an old home. And yes, the original wood door frames were pitched out.
OK, that's just my opinion. Arches have their place, some are rennaissance-like in their scientific order, others romantically tudor or buxom-and-romanesque. These were weak ill-placed and out of proportion with the rest of the house. Somehow they make the ceilings lower and rooms smaller than their angular wooden counterparts. This one, on the stairway to the third floor, was a DIY nightmare.
Each set of stairs in the house (there are 2 remaining of 3 original, not counting the basement) ascends up about half way, turns back on itself at a landing, then continues its ascent to the next floor. From the second to the third floor the landing also contains a door. Because of the slope of the roof and stairs, the door was not full height, causing the entrant to stoop a bit.
At some point, I think recently, the door was removed and a DIY arch "created," mimicing others in the house and, seemingly, to increase head room. Curiously, the head room was added by cutting out one of the support beams for the roof (stupid, stupid, stupid ...). The crafty person next wadded up some fiberglass window screen and, with the help of spray-foam insulation, filled the square corners of the doorway to create a sort-of-arched shape. Next, spray-foam insulation was heavily applied to further "shape" and "refine" the lob-sided arch, followed by a thick layer of ceiling texture stuff was wadded over that to "finish" the shape.
Imagine my surprise when I walked up the stairs the first time to start deconstructing the arch. I whacked the curved corners with a hammer, expecting it to crack open the plaster, only to have the hammer "sucked" into the spray-foam insulation. I just stood there, hammer stuck in the "plaster," wondering what the heck ... ?? ...
Now, the funny thing (as if this whole thing isn't just a hilarious joy) about this doorway is that, while the person installing the other arches removed all original wood door trim and framing, this one left the trim and framing in place. Well, except the header, which was hacked out, I guess, because they didn't want to stoop to get into the third floor anymore. So the door opening was made-up of two sides of wood framing and trim, with a curved, rough-textured, windowscreen-and-foam-framed, arch top - UGH. (sad little side-note, there is another door on the third floor similar to this that has a funky panel hinged to the top of the door and if you aren't careful, it can slip and bash you in the head when you go through the door. I bet the same person did both.)
After hours of digging the tenacious spray-foam out, I found the old framing. As you can see in the following diagram, a header and two cripple studs should be above the door opening. Thos are what were cut out on this door frame. I put in a new header, situated a few inches higher than the original to gain some head room. There is no door so the slope of the roof can be ignored for door swing, which is why the door was short in the first place.
Arches here at the JS house were put in to replace the wood framed doorways that were original to the house. This one is no exception. Most of the arches were installed using a purchased metal framing kit, made up of three pieces of metal that, when fit together into the doorway, transformed beautiful wood framed openings, into "seductive, curvaceous, sirens, leaving all who look upon them wide-eyed and frightened that anything so horrific could be done to an old home. And yes, the original wood door frames were pitched out.
OK, that's just my opinion. Arches have their place, some are rennaissance-like in their scientific order, others romantically tudor or buxom-and-romanesque. These were weak ill-placed and out of proportion with the rest of the house. Somehow they make the ceilings lower and rooms smaller than their angular wooden counterparts. This one, on the stairway to the third floor, was a DIY nightmare.
Some Background
Each set of stairs in the house (there are 2 remaining of 3 original, not counting the basement) ascends up about half way, turns back on itself at a landing, then continues its ascent to the next floor. From the second to the third floor the landing also contains a door. Because of the slope of the roof and stairs, the door was not full height, causing the entrant to stoop a bit.
And Then ...
At some point, I think recently, the door was removed and a DIY arch "created," mimicing others in the house and, seemingly, to increase head room. Curiously, the head room was added by cutting out one of the support beams for the roof (stupid, stupid, stupid ...). The crafty person next wadded up some fiberglass window screen and, with the help of spray-foam insulation, filled the square corners of the doorway to create a sort-of-arched shape. Next, spray-foam insulation was heavily applied to further "shape" and "refine" the lob-sided arch, followed by a thick layer of ceiling texture stuff was wadded over that to "finish" the shape.
Imagine my surprise when I walked up the stairs the first time to start deconstructing the arch. I whacked the curved corners with a hammer, expecting it to crack open the plaster, only to have the hammer "sucked" into the spray-foam insulation. I just stood there, hammer stuck in the "plaster," wondering what the heck ... ?? ...
| Another corner, some of the gloppy spackle removed so you can see the lovely spray foam insulation going on |
| Yep that's right, it's not a power tool. Using a classic saw was the easiest, fastest, and most precise way to trim the old header flush with the wall so I can extend the jamb upwards. |
Now, the funny thing (as if this whole thing isn't just a hilarious joy) about this doorway is that, while the person installing the other arches removed all original wood door trim and framing, this one left the trim and framing in place. Well, except the header, which was hacked out, I guess, because they didn't want to stoop to get into the third floor anymore. So the door opening was made-up of two sides of wood framing and trim, with a curved, rough-textured, windowscreen-and-foam-framed, arch top - UGH. (sad little side-note, there is another door on the third floor similar to this that has a funky panel hinged to the top of the door and if you aren't careful, it can slip and bash you in the head when you go through the door. I bet the same person did both.)
After hours of digging the tenacious spray-foam out, I found the old framing. As you can see in the following diagram, a header and two cripple studs should be above the door opening. Thos are what were cut out on this door frame. I put in a new header, situated a few inches higher than the original to gain some head room. There is no door so the slope of the roof can be ignored for door swing, which is why the door was short in the first place.
Next Ill need to frame in the jambs, matching the existing jambs on the sides with some pieces cut to fit at the top, add some trim to both sides of the wall and fill in the missing wall (plaster/drywall) at the top. I'll post more once I get that stuff done.
Stay tuned ...